News

  • Nordnesfjellet is thawing

    The permafrost on Nordnesfjellet in northern Norway, which Cautus Geo monitors with a variety of sensors, is melting. Read more from NRK: http://nrk.no/viten/xl/nar-fjellene-tiner-1.13013787

  • Joberget – the first tunnel in loose soils

    Cautus Geo is keeping an eye on the first tunnel being built in loose soil/rock formations to make sure it remains stable during construction. Read more about the project here: http://joberget-f

  • Monitoring pore pressure in Sogndal

    In 1958, construction was completed on the Loftesnes bridge in Sogndal, a highly important connector along Rv.5. Now the Norwegian road authority (Statens vegvesen) is building a new bridge in close proximity to the existing one, and work on the foundation is already underway. Under commission from K.A. Aurstad AS, Cautus Geo has recently delivered… Read more »

  • Geotechnical engineering course in Trondheim

    We work to stay up to date within our field, and we place an emphasis on development and knowledge. In pursuit of these objectives, Nils Arne and Jonas have participated in a geotechnical engineering course in Trondheim organized by NTNU.

  • NIFS project completion

    The NIFS (Natural Hazards, infrastructure, floods and landslides) project is a joint strategic cooperation between the National Rail Administration (Jernbaneverket), Norwegian Water Resources and Energy Directorate (NVE) and the Public Roads Administration (Statens vegvesen). Cautus Geo has participated in subproject 4, monitoring and warning, with systems monitoring roadside safety nets, snow and climate. We also… Read more »

  • Certification course

    Yesterday we were visited by Granlund Competency who provided a course for us on “Construction personnel along and on roads”, so we are now re-certified for 3 years.

  • Exciting monitoring project in Mosjøen

    Cautus Geo is currently involved in an exciting monitoring project in connection with the development of the harbor area in Mosjøen. Under direction of NCC, we started field installation last week. The project will last for several years and includes monitoring of pore pressure, deformation and vibration of buildings and vulnerable structures during construction work…. Read more »

  • Measurand distributor meeting 2016

    The year’s distributor meeting was held in a beautiful setting in Cuba. Measurand gathered distributors from the whole world and we had 4 days with good discussions and sharing of experiences. Measurand has experienced positive growth in recent years and production has now exceeded 130.000 meters of SAA. The largest market is in the US… Read more »